Company

DSP Engineering

HISTORY

1990
11
Established DSP Engineering as a private business
2009
~2022
Began EPC business – Constructed multiple solar power plants (1MW scale):
• Jeongeup Solar Power Plant
• Namwon Solar Power Plant
• Hyeonggok-ri Solar Power Plant
• NK Tech Solar Power Plant
• DSP 1, 2, 3 Solar Power Plants
• Four Seasons Solar Power Plant
• Seonwon-ri No.5 Solar Power Plant
2012
04
Incorporated as DSP Engineering Co., Ltd.
2020
05
Acquired ISO 9001 Certification
2021
04
Registered patent
(Solar power generation device combining anchor bolts and insulation material)
2022
03
Relocated Hwaseong Namyang plant → New Cheongbuk plant established
09
Registered patent (Solar power generation device with waterproof functionality)
2023
01
Registered as an Electrical Contractor (경기-06789호)
07
Acquired Standard Certification (for solar power devices under 500kW)
10
Verified certificate of direct production (for solar power systems)
11
Acquired KS Certification for solar panel connectors
2024
08
Registered as a qualified bidder (Public Procurement Service)
2025
04
Acquired ISO 45001 Certification